Dam safety filing deadlines by state
Every state runs its own clock. Here is what each one actually asks a dam owner to file, and when.
The three shapes a deadline comes in
There is no national dam filing deadline, and state programmes are not variations on one template — they are genuinely different models. Knowing which shape your state uses tells you whether your date is already fixed, already published, or does not exist yet at all.
1. One fixed calendar date
The state names a date and every owner in scope files by it, regardless of when the dam was built or last inspected. Georgia, Ohio, Pennsylvania, and New York work this way.
2. A rolling per-dam anniversary
The state publishes a date per dam — usually keyed to when your last submission was approved — so two neighbouring owners have different deadlines. North Carolina works this way.
3. A window that opens when you inspect
There is no date on the calendar until your engineer inspects; the filing is then due a set number of days later. Massachusetts, Connecticut, and Wisconsin work this way, which is why no deadline can be computed for them in advance.
The eight states Dam-Sure covers
| State | Agency | What the owner files | Deadline | Date shown in Dam-Sure |
|---|---|---|---|---|
| Georgia | EPD Safe Dams Program | Annual report | 30 April — same date for every owner | Yes |
| Ohio | ODNR Division of Water Resources | Annual dam-safety fee (Class I–III); liability certification (exempt dams) | 30 June — same date for everyone in scope | Yes |
| Pennsylvania | DEP, 25 Pa. Code Ch. 105 | PE-sealed annual report | 31 December — same date for every owner | Yes |
| New York | NYSDEC Dam Safety | Annual certification | 31 January — intermediate and high hazard only | Yes, above the hazard threshold |
| North Carolina | NCDEQ Dam Safety (DEMLR) | EAP resubmission | Rolling — your own anniversary, published per dam | Yes, where the state publishes a date for that dam |
| Massachusetts | MassDEP Office of Dam Safety | PE inspection report | 30 days after the inspection | No — no anchor date is published |
| Connecticut | CT DEEP, State Dams & Dam Safety | PE inspection report | 30 days after the inspection | No — no anchor date is published |
| Wisconsin | Wisconsin DNR | Inspection report | 90 days after the inspection | No — published inspection dates are too sparse to rely on |
The last column is deliberately honest about the gaps. Where a state publishes nothing to anchor a date to, Dam-Sure says so instead of inventing one — a fabricated deadline is worse than a missing one. Look up your dam to see what is actually on file for it.
The rest of the country
Dam-Sure holds inventory for the eight states above. The notes below come from a separate review of all 50 states and DC, summarised here because the question comes up constantly — but they are research notes at varying confidence, not a compliance guarantee. Check with your own state agency before acting on any of it.
States where the state does the inspecting
California, Texas, Washington, Mississippi, Colorado, Kentucky, South Carolina, and Arkansas put the inspection burden largely on the agency rather than the owner. The owner responds to findings and keeps records; there is generally no proactive annual filing date. California's DSOD inspects annually itself, and Texas exempts a large class of private dams from the regime wholesale.
Hybrid states
Idaho, Montana, Arizona, Utah, Indiana, Oklahoma, Kansas, Alaska, Vermont, Virginia, New Jersey, and Maryland split the work: the owner self-inspects or hires a PE on a hazard-based schedule, and the state inspects on its own cycle. Most set a frequency rather than a filing date — Virginia is the clearest exception, with a 30-day window after an inspection.
Alabama
Alabama is the only state with no state-level dam safety regulatory programme at all.
Not yet sourced
For roughly twenty further states — including Florida, Illinois, Michigan, Minnesota, Missouri, Oregon, and Tennessee — a dam safety programme exists, but the specific owner-filing requirements and deadlines were not sourced to a standard worth publishing. They are listed as unknown here rather than guessed at.
Why this is hard to track by hand
The checklist you inspect with differs by state too — see what each state's is built from. An owner with dams in two states has two unrelated clocks, and a consultancy signing reports across a region may be tracking four or five shapes at once. That is the problem Dam-Sure is built around: the deadline is computed per state from that state's own rule, rather than being a reminder you set yourself and hope you got right. See how firms use it.
Compiled from each state agency's own published material — Georgia EPD's Safe Dams Program, NCDEQ, NYSDEC, ODNR, PA DEP, MassDEP, CT DEEP, and Wisconsin DNR — alongside ASDSO summary data for states outside Dam-Sure's coverage. Confidence varies by state and is lowest outside the eight covered above. This page is informational, not legal advice — verify current requirements with your own state agency directly.
Requirements by state: Connecticut · Georgia · Massachusetts · North Carolina · New York · Ohio · Pennsylvania · Wisconsin